This was a preexisting basement finish from the 1980’s. Our team added a bathroom, removed water damaged walls in the bedroom from a prior exterior leak, installed drywall and installed LVP flooring throughout to modernize this home.
This was a preexisting basement finish from the 1980’s. Our team added a bathroom, removed water damaged walls in the bedroom from a prior exterior leak, installed drywall and installed LVP flooring throughout to modernize this home.